Wetland restorationPlanned
Sand Dune Aquifer Recharge Basins
Construction of 14 infiltration basins in the Doñana dune system to capture winter rainfall and channel it into the critically over-exploited Almonte-Marismas aquifer, supplementing base flows to the Marismas.
Marismas del Guadalquivir · HydroBASINS L8: 2080029210
May 2025 – ongoing
Parque Nacional de Doñana / Ministerio para la Transición Ecológica / Instituto Geológico y Minero de España (IGME)
145 ha · € 7.2M
Sub-basin location
HydroBASINS Level 8 polygon
Sub-basin boundary: HydroBASINS Level 8 (HYBAS_ID 2080029210) · Polygon is approximate at this zoom
Basin Health Impact
Before vs. projected after project contribution
Water Quantity+10 pts
Before
29Low
After39Low
Water Quality+3 pts
Before
44Low
After47Low
Riparian HabitatNo signal
Before
42Low
Composite BHS contribution+5 pts
Weighted: Quantity × 0.45 + Quality × 0.20 + Habitat × 0.35
Ground Validation
IoT sensors · Galileo/EGNOS certified
Almonte–Marismas Groundwater Sensor
Groundwater Depth
Galileo ±0.4m
Sentinel-1 InSAR subsidence
Satellite: 5.1 m bglIn-situ: 4.8 m bgl
91% agreementGuadalquivir Estuary Turbidity Probe
Turbidity
Galileo ±0.5m
Sentinel-3 OLCI turbidity
Satellite: 33.2 NTUIn-situ: 31.4 NTU
95% agreementIn-situ readings from Galileo/EGNOS-certified IoT devices validate satellite-derived indices. High agreement confirms satellite-based BHS scoring for CSRD E3-4 discharge evidence.
Delivery metrics
- Budget
- € 7.2M
- Area
- 145 ha
- Timeline
- May 2025 – ongoing
- Status
- Planned
- Delivered
- Target: 14 infiltration basins; est. 4.1 hm³ /yr aquifer recharge
Compliance exports
Two primary live clicks: project + compliance JSON
- CSRDESRS E3-4Water consumption, basin stress and restoration contribution evidence
- CSDDDArticle 8Adverse-impact mitigation programme linked to basin outcomes
- SBTNStep 3 — QuantityFreshwater target-setting inputs at sub-basin level
- TNFDLEAP — LocateNature-risk evidence for geolocated restoration activity
Using live score context
Using live basin score
Audit trail
Replay the evidence lineage for this stewardship project
- Project geographyHydroBASINS Level-8 anchor and project centroid used for repeatable basin-level evidence generation.
hybas=2080029210 center=-6.50000, 36.95000
- Evalscript versionsPinned, content-addressed evalscripts. Replayable byte-for-byte.
sentinel2-bhs-combined-v1@static-snapshot outputs=ndwi,mndwi,ndvi,ndmi,turbidity,chla,bare
- Source scenesRecent STAC scene IDs attached to the basin score run for audit replay.
No STAC scene IDs attached
- Scoring functionBasin sub-indices weighted via
bhs-v0.5.0.quantity*0.45 + habitat*0.35 + quality*0.2
- Computation provenanceRun signature stored with the exported project evidence pack.
run=static-snapshot · at=2026-04-28T19:58:03.565Z
Partners
Operator
Parque Nacional de Doñana / Ministerio para la Transición Ecológica
Partner
Instituto Geológico y Minero de España (IGME)
Basin context
Doñana / Huelva Basin
BHS 38 · 2 projects · 0.5M people