Irrigation efficiencyActive
Aragón Drip Irrigation Conversion
Large-scale conversion of 8,500 ha of gravity-irrigated fruit and vegetable fields in Aragón to precision drip and micro-sprinkler irrigation, targeting 40% reduction in water abstractions.
Ebro – Aragón · HydroBASINS L8: 2080012480
Jan 2023 – ongoing
Comunidades de Regantes del Ebro / CHE (Confederación Hidrográfica del Ebro) / EU FEADER
8,500 ha · € 14.8M
Sub-basin location
HydroBASINS Level 8 polygon
Sub-basin boundary: HydroBASINS Level 8 (HYBAS_ID 2080012480) · Polygon is approximate at this zoom
Basin Health Impact
Before vs. projected after project contribution
Water Quantity+11 pts
Before
44Low
After55Risk
Water QualityNo signal
Before
58Risk
Riparian HabitatNo signal
Before
55Risk
Composite BHS contribution+5 pts
Weighted: Quantity × 0.45 + Quality × 0.20 + Habitat × 0.35
Ground Validation
IoT sensors · Galileo/EGNOS certified
Tortosa Discharge Gauge
Discharge
Galileo ±0.4m
Sentinel-1 SAR coherence
Satellite: 125 m³/sIn-situ: 118 m³/s
94% agreementAragón Irrigation Soil Moisture
Volumetric Soil Moisture
Galileo ±0.5m
Sentinel-1 VV/VH backscatter
Satellite: 0.18 m³/m³In-situ: 0.17 m³/m³
94% agreementIn-situ readings from Galileo/EGNOS-certified IoT devices validate satellite-derived indices. High agreement confirms satellite-based BHS scoring for CSRD E3-4 discharge evidence.
Delivery metrics
- Budget
- € 14.8M
- Area
- 8,500 ha
- Timeline
- Jan 2023 – ongoing
- Status
- Active
- Delivered
- 4,200 ha converted; 28.6 hm³ /yr abstraction avoided to date
Compliance exports
Two primary live clicks: project + compliance JSON
- CSRDESRS E3-4Water consumption, basin stress and restoration contribution evidence
- CSDDDArticle 8Adverse-impact mitigation programme linked to basin outcomes
- SBTNStep 3 — QuantityFreshwater target-setting inputs at sub-basin level
- TNFDLEAP — LocateNature-risk evidence for geolocated restoration activity
Using live score context
Using live basin score
Audit trail
Replay the evidence lineage for this stewardship project
- Project geographyHydroBASINS Level-8 anchor and project centroid used for repeatable basin-level evidence generation.
hybas=2080012480 center=-0.35000, 41.55000
- Evalscript versionsPinned, content-addressed evalscripts. Replayable byte-for-byte.
sentinel2-bhs-combined-v1@static-snapshot outputs=ndwi,mndwi,ndvi,ndmi,turbidity,chla,bare
- Source scenesRecent STAC scene IDs attached to the basin score run for audit replay.
No STAC scene IDs attached
- Scoring functionBasin sub-indices weighted via
bhs-v0.5.0.quantity*0.45 + habitat*0.35 + quality*0.2
- Computation provenanceRun signature stored with the exported project evidence pack.
run=static-snapshot · at=2026-04-28T19:57:23.312Z
Partners
Operator
Comunidades de Regantes del Ebro
Partner
CHE (Confederación Hidrográfica del Ebro) / EU FEADER
Basin context
Ebro Basin
BHS 52 · 2 projects · 3.5M people