Irrigation efficiencyActive

Lombardy Drip Irrigation Pilot

Conversion of 3,400 ha of flood-irrigated cereal fields to precision drip irrigation in the Po-Lambro sub-basin, reducing abstraction by 35%.

View Po Basin
Po di Lambro · HydroBASINS L8: 2050016180
Apr 2024 – ongoing
Consorzio di Bonifica Est Ticino Villoresi / Regione Lombardia / Netafim Italia
3,400 ha · € 5.2M
Sub-basin location
HydroBASINS Level 8 polygon

Sub-basin boundary: HydroBASINS Level 8 (HYBAS_ID 2050016180) · Polygon is approximate at this zoom

Basin Health Impact
Before vs. projected after project contribution
Water Quantity+9 pts
Before
51Low
After
60Risk
Water QualityNo signal
Before
60Risk
Riparian HabitatNo signal
Before
64Risk
Composite BHS contribution+4 pts

Weighted: Quantity × 0.45 + Quality × 0.20 + Habitat × 0.35

Ground Validation
IoT sensors · Galileo/EGNOS certified
Pavia Soil Moisture Probe
Volumetric Soil Moisture
Galileo ±0.5m
Sentinel-1 VV/VH backscatter
Satellite: 0.22 m³/m³In-situ: 0.24 m³/m³
91% agreement
Po Delta DO Sensor
Chlorophyll-a
Galileo ±0.6m
Sentinel-3 OLCI Chl-a retrieval
Satellite: 11.8 µg/LIn-situ: 12.6 µg/L
94% agreement

In-situ readings from Galileo/EGNOS-certified IoT devices validate satellite-derived indices. High agreement confirms satellite-based BHS scoring for CSRD E3-4 discharge evidence.

Delivery metrics

Budget
€ 5.2M
Area
3,400 ha
Timeline
Apr 2024 – ongoing
Status
Active
Delivered
1,800 ha converted; 12.4 hm³ /yr abstraction avoided to date
Compliance exports
Two primary live clicks: project + compliance JSON
  • CSRD
    ESRS E3-4Water consumption, basin stress and restoration contribution evidence
  • CSDDD
    Article 8Adverse-impact mitigation programme linked to basin outcomes
  • SBTN
    Step 3 — QuantityFreshwater target-setting inputs at sub-basin level
  • TNFD
    LEAP — LocateNature-risk evidence for geolocated restoration activity
Using live score context
Using live basin score
Audit trail
Replay the evidence lineage for this stewardship project
  1. Project geography
    HydroBASINS Level-8 anchor and project centroid used for repeatable basin-level evidence generation.
    hybas=2050016180
    center=9.55000, 45.35000
  2. Evalscript versions
    Pinned, content-addressed evalscripts. Replayable byte-for-byte.
    sentinel2-bhs-combined-v1@static-snapshot
    outputs=ndwi,mndwi,ndvi,ndmi,turbidity,chla,bare
  3. Source scenes
    Recent STAC scene IDs attached to the basin score run for audit replay.
    No STAC scene IDs attached
  4. Scoring function
    Basin sub-indices weighted via bhs-v0.5.0.
    quantity*0.45 + habitat*0.35 + quality*0.2
  5. Computation provenance
    Run signature stored with the exported project evidence pack.
    run=static-snapshot · at=2026-04-28T19:55:57.376Z

Partners

Operator
Consorzio di Bonifica Est Ticino Villoresi
Partner
Regione Lombardia / Netafim Italia

Basin context

Po Basin
BHS 58 · 2 projects · 16M people
View all projects in Po Basin