Floodplain reconnectionActive
Cologne Floodplain Reconnection
Breaching of historical embankments to reconnect 480 ha of Rhine floodplain near Cologne, restoring natural flood retention and riparian habitat.
Niederrhein · HydroBASINS L8: 2020045080
Apr 2023 – ongoing
Wasser- und Schifffahrtsamt Rhein / WWF Deutschland / NRW Umweltministerium
480 ha · € 3.2M
Sub-basin location
HydroBASINS Level 8 polygon
Sub-basin boundary: HydroBASINS Level 8 (HYBAS_ID 2020045080) · Polygon is approximate at this zoom
Basin Health Impact
Before vs. projected after project contribution
Water Quantity+6 pts
Before
64Risk
After70Good
Water Quality+3 pts
Before
78Good
After81Good
Riparian Habitat+14 pts
Before
74Good
After88Good
Composite BHS contribution+8 pts
Weighted: Quantity × 0.45 + Quality × 0.20 + Habitat × 0.35
Ground Validation
IoT sensors · Galileo/EGNOS certified
Lobith Discharge Gauge
Discharge
Galileo ±0.3m
Sentinel-1 SAR coherence
Satellite: 1910 m³/sIn-situ: 1840 m³/s
96% agreementRotterdam Estuary Turbidity Probe
Turbidity
Galileo ±0.4m
Sentinel-2 B04 reflectance
Satellite: 19.8 NTUIn-situ: 18.4 NTU
93% agreementIn-situ readings from Galileo/EGNOS-certified IoT devices validate satellite-derived indices. High agreement confirms satellite-based BHS scoring for CSRD E3-4 discharge evidence.
Delivery metrics
- Budget
- € 3.2M
- Area
- 480 ha
- Timeline
- Apr 2023 – ongoing
- Status
- Active
- Delivered
- 480 ha floodplain reconnected; est. 2.1 hm³ retention capacity restored
Compliance exports
Two primary live clicks: project + compliance JSON
- CSRDESRS E3-4Water consumption, basin stress and restoration contribution evidence
- CSDDDArticle 8Adverse-impact mitigation programme linked to basin outcomes
- SBTNStep 3 — QuantityFreshwater target-setting inputs at sub-basin level
- TNFDLEAP — LocateNature-risk evidence for geolocated restoration activity
Using live score context
Using live basin score
Audit trail
Replay the evidence lineage for this stewardship project
- Project geographyHydroBASINS Level-8 anchor and project centroid used for repeatable basin-level evidence generation.
hybas=2020045080 center=6.95000, 50.95000
- Evalscript versionsPinned, content-addressed evalscripts. Replayable byte-for-byte.
sentinel2-bhs-combined-v1@static-snapshot outputs=ndwi,mndwi,ndvi,ndmi,turbidity,chla,bare
- Source scenesRecent STAC scene IDs attached to the basin score run for audit replay.
No STAC scene IDs attached
- Scoring functionBasin sub-indices weighted via
bhs-v0.5.0.quantity*0.45 + habitat*0.35 + quality*0.2
- Computation provenanceRun signature stored with the exported project evidence pack.
run=static-snapshot · at=2026-04-28T19:55:06.667Z
Partners
Operator
Wasser- und Schifffahrtsamt Rhein
Partner
WWF Deutschland / NRW Umweltministerium
Basin context
Rhine Basin
BHS 71 · 2 projects · 58M people
View all projects in Rhine Basin →