Wetland restorationPlanned

Upper Rhine Gravel Bar Rehabilitation

Removal of channelisation structures to restore braided river morphology and gravel bar habitats for spawning fish in the Upper Rhine.

View Rhine Basin
Oberrhein · HydroBASINS L8: 2020044760
Mar 2025 – ongoing
Regierungspräsidium Freiburg / IKSR / Lachsprojekt Rhein
210 ha · € 2.8M
Sub-basin location
HydroBASINS Level 8 polygon

Sub-basin boundary: HydroBASINS Level 8 (HYBAS_ID 2020044760) · Polygon is approximate at this zoom

Basin Health Impact
Before vs. projected after project contribution
Water QuantityNo signal
Before
64Risk
Water QualityNo signal
Before
78Good
Riparian Habitat+8 pts
Before
74Good
After
82Good
Composite BHS contribution+3 pts

Weighted: Quantity × 0.45 + Quality × 0.20 + Habitat × 0.35

Ground Validation
IoT sensors · Galileo/EGNOS certified
Lobith Discharge Gauge
Discharge
Galileo ±0.3m
Sentinel-1 SAR coherence
Satellite: 1910 m³/sIn-situ: 1840 m³/s
96% agreement
Rotterdam Estuary Turbidity Probe
Turbidity
Galileo ±0.4m
Sentinel-2 B04 reflectance
Satellite: 19.8 NTUIn-situ: 18.4 NTU
93% agreement

In-situ readings from Galileo/EGNOS-certified IoT devices validate satellite-derived indices. High agreement confirms satellite-based BHS scoring for CSRD E3-4 discharge evidence.

Delivery metrics

Budget
€ 2.8M
Area
210 ha
Timeline
Mar 2025 – ongoing
Status
Planned
Delivered
Target: 6 km channel remeandering; 210 ha gravel bar habitat
Compliance exports
Two primary live clicks: project + compliance JSON
  • CSRD
    ESRS E3-4Water consumption, basin stress and restoration contribution evidence
  • CSDDD
    Article 8Adverse-impact mitigation programme linked to basin outcomes
  • SBTN
    Step 3 — QuantityFreshwater target-setting inputs at sub-basin level
  • TNFD
    LEAP — LocateNature-risk evidence for geolocated restoration activity
Using live score context
Using live basin score
Audit trail
Replay the evidence lineage for this stewardship project
  1. Project geography
    HydroBASINS Level-8 anchor and project centroid used for repeatable basin-level evidence generation.
    hybas=2020044760
    center=7.70000, 47.90000
  2. Evalscript versions
    Pinned, content-addressed evalscripts. Replayable byte-for-byte.
    sentinel2-bhs-combined-v1@static-snapshot
    outputs=ndwi,mndwi,ndvi,ndmi,turbidity,chla,bare
  3. Source scenes
    Recent STAC scene IDs attached to the basin score run for audit replay.
    No STAC scene IDs attached
  4. Scoring function
    Basin sub-indices weighted via bhs-v0.5.0.
    quantity*0.45 + habitat*0.35 + quality*0.2
  5. Computation provenance
    Run signature stored with the exported project evidence pack.
    run=static-snapshot · at=2026-04-28T19:55:06.667Z

Partners

Operator
Regierungspräsidium Freiburg
Partner
IKSR / Lachsprojekt Rhein

Basin context

Rhine Basin
BHS 71 · 2 projects · 58M people
View all projects in Rhine Basin